I scrambled up to the new loft level to take some shots before the rafters were enclosed. Above is looking North.
Northeast
East
South
Westand we don't have to look Northwest into the neighbor's yard!
How I built my painting studio and lived to tell the tale
An adventure in lay architecture

The best way to make this work both economically and structurally was to go with pre-fab trusses for the main room and hand-cut trusses for over the loft. That's why, in the next-to-last post, the pre-fab truss work stops where the loft begins.
Here, you can see J. and his lovely assistant finishing off their hand-cut truss work.
One thing I would have done differently is to leave maximum overhang of eaves. J. gave me the option of leaving any length of overhang and suggested a maximum. My roofer recommended a minimum. I went for a happy medium because I was concerned that a big overhang might interfere with light and not be in keeping with the other architecture in the neighborhood. In retrospect, I would have preferred a deeper overhang for more protection from the rain.
Here's how the pre-fab trusses were raised:
Click here for a quick technical explanation of this process.
Nowhere in any technical explanation of this process does it say to order 2 six-packs of beer with a pizza lunch for two men with bad backs climbing on scaffolding to affix trusses over concrete slab. When I strongly objected to the liquid portion of the lunch order, I was dismissed and overruled.
But there was the structure at the stage that it was, and it had to be finished, so things proceeded but less happily than before.






The back (south) wall goes up
and the OSB is attached.
We included a garage door frame in the front wall. Just in case some future person might want to use the building as a garage (you never know!).
The interior wall finally goes up after considerable deliberation on my part to figure the measurements properly. (They're still being patient with me.)
Becoming something!
View from the alley.
Just like building blocks. What I thought would be difficult, turned out to be simple and what I gave no thought to at all, turned out to be difficult. That's life, eh?
J. took a look at my pencil sketches on graph paper, marked off the 2 x 4s with his carpenters pencil and the three of them cut, assembled an raised the walls in a morning. To me, it was amazing!
I had so many questions that I truly was a pain in the ass. But J. was patient and explained things to me and I tried to stay out of the way and inside (which was a challenge).
I loved seeing the window framing! It gave me a little thrill to see the window ideas appear in three dimensions. Isn't that funny?
I mean, imagine Brunelleschi!
One.
Two.
Three.
Here's most of the Home Depot delivery. The plywood, OSB, bags of cement, black paper for the roof was delivered without much of a hitch though we did discover where the old septic tank is situated.
We put the pile of siding out of the way for the time being. You can see it stacked to the left of the trusses. The truss delivery truck managed to run over my young Leland Cypress:
Which I propped back up and am happy to say is now quite a bit taller than I am. The 2 x 4s would come in the morning and out of these little piles (more or less) we made quite a nice building. What's missing in these photos are the shingles, windows and doors. Oh, and the sheet rock. Plus, of course, everything inside.
Prepping for the final pour.
Laying down the plastic moisture barrier.
Mr. Lawson Redi Mix.
Rubber boot time!
Spreading the mix.
Smoothing the mix.
Smoothing the edges.
Smoothing the surface.
This machine creates the whirled pattern on cement that keeps the surface from being dangerously slick.
The fine tuning. They really made a beautiful surface that, I am sorry to say, was later ruined by indiscriminate tossing of tools from the trusses to the floor. It mattered for a minute but is no longer of any consequence, like so many things we find upsetting in any given moment.
Ah! The finished slab. Lovely!