19 December 2007

Sink and Counter



Another Home Depot assemblage from the standard under cabinet to the counter top, sink, faucet and drain covers. One of the handymen set up the cabinet, cut the counter top and set the sink. I made all the fine adjustments that have to be made for those pre-cut cabinet drawers and doors to sit right.

The plumber managed the hot water heater faucets and drains. He complained about the way the sink was set but it works just fine. By that time I was used to one workman criticizing a previous workman's work.

18 December 2007

Finishing work



This was the staging area for sawing and sanding and what-not of most of the finishing work. Come to think of it, I'll bet that's why this section of earth has had the most difficult time recovering.

17 December 2007

Appliances



The track lighting had been installed and you'll see glimpses of that over the next couple of weeks. I bought a very simple style of track light spots — the least expensive, too — at the local Home Depot where they had set me a special chair by the customer service counter (just kidding, but barely). Then the fan! I spent a lot of time selecting just the right fan and finally selected a beautiful Minka-Aire Concept 1 fan with an optional center light and reversible directions. I love it.

I also had to find the right air conditioner / heater. I needed a unit that would easily heat and cool the large space, be energy and cost efficient and relatively quiet. I was happy to find a good Fedders model AEY 18F7G from a great company in California, Genie Air. Even with shipping, I paid a lower price than I would have anywhere else with any sort of discount. It's not rated the most efficient but not the least either. It's a 9.7 and considering the high ceiling and the cement slab foundation does a damned good job. I think that radiant floor heat is the way to go but for this project that was not an option. I turn the unit off after it cools down or heats up the place. Under 40 degrees, especially down around freezing, I have to keep it running when the sun is not shining. I have good passive solar on sunny days from the south windows and door in the back room.



For hot water at the sink, I bought an Ariston GL2.5 Point-of-Use Electric Mini-Tank Water Heater through Amazon where I found it at the best price. It's perfect and gives me just the right amount of hot water to wash the glasses and plates.

16 December 2007

The path


I moved these pavers more times than I would have liked to but we finally got them settled in their good spots. We all loved the curve the path took. Fitting the nine bricks into the gap between the pavers gave me great admiration for brick workers.

15 December 2007

Tom's Truck


Way back when J. quit and I was momentarily destabilized, I called my friend Tom Kimmel to tell him that I'd take him up on his offer to loan me his truck. He said, and I quote, just keep it as long as you need to. Apparently I needed to keep it for about 3 months. Tom's loan of his truck to me was the single most empowering event throughout this experience. It was amazing how quickly I became adept at tooling around in the pick up. The two most important things were first that someone would be kind enough to extend such trust and generosity in the midst of my chaos and second that I could go do and pick up anything I needed to in the course of the building without waiting for or relying on someone I'd have to hire. I heaved and hoed bricks and lumber and trim and dirt and plants and god know's what else. A great liberation to be able to do it on my own. Thanks again, Tom!

14 December 2007

The fence at the end of the drive

The other thing I was able to do now that the trucks were gone was to close off the end of the drive for privacy in the front of the studio. The fence posts were set. I picked up 3 more panels at Lowe's and was able to tip them out of the back of the pick up on my own. The pickup? Stay tuned for tomorrow's post



One of the handymen and I attached two of the panels with some lattice at the top to match the rest of the fencing. I left enough space to drive a car through between the house and the edge of the fence just in case.

The third panel went to a single section for privacy behind the shed portion of the studio. That will show up in an eventual post.


13 December 2007

Shrubs


You can't make a building without considering the site. Hence, these bits about the grounds.

I had been waiting to plant a hedge until all of the trucks were through. So the trucks were gone and my shrub stash was ready to take possession of their new home. I wanted an evergreen foundation that would grow quickly and thrive and act as a natural fencing element. Elaeagnus is non-native and invasive but it's a good retreat for wildlife, produces berries for birds and fragrant blooms several times a year. Because I wanted a more wild, less cultivated look, and because I was planting in a straight line, I thought that by varying the plants I might creat more interest. I planted several elaeagnus, then a red-tipped photinia and then several wax-leaf privet (which have fragrant blooms at different times than the elaeagnus).

Anchored by leyland cyprus at far corner that will soon become a giant.

The view from the studio is surprisingly expansive for the neighborhood. I wanted to keep the view but needed protection and privacy so chose to use wire fence to supplement the young shrubs. It's virtually invisible but keeps strangers from strolling through the yard as a short cut (or for more nefarious reasons) and was definitely in keeping with my shoestring budget.

11 December 2007

Weeds and Seeds



Not a pretty sight, eh? I admit it. I became obsessed with crabgrass. After all of the clover seed I spread (and I spread a lot of it) I could not, for the life of me , figure out how this crabgrass entered the scene. Later I learned, as I mentioned in yesterday's post, that the weed seed came in with the hay. Hey!

I like to let things run on the wild-ish side and a weed is only a plant that you'd rather not have in the place where it takes root but I battled this crabgrass like my Aunt Nancy used to battle her squirrels. What I learned is that crabgrass is an extremely intelligent plant and I am not kidding. It was as if it knew when I was going to try to dig it up and propagated itself as I approached. In any event, I was finally reminded by some biodynamic landscapers that the crabgrass is just a sign of the earth healing itself. So I let that obsession go and turned my attention to the beginnings of my perennial beds.

These modest beginnings have yielded some sturdy returns and I've learned what's good for these parts and what is least likely to survive. Any sort of salvia takes off with a fertile vengeance for life. The anise hyssop makes a great party for a wide variety of bees and other colorful, happy flying bugs. You can see what I've cut back after the second summer on yesterday's My Great Day blog.

10 December 2007

Meanwhile, in the lower 40...


I was up early and often with the rake and trusty wheel barrow. The light was so beautiful this particular morning. Hard labor but enjoyable.

Now, a word about hay. Don't use it unless you know the parents and its family background. I'm not kidding. This particular batch of hay (and the hay my next door neighbor used about this time for his own project) was teeming with weed seeds. Crabgrass varieties to be more exact. Not a good thing. Just seed at the right time of year before a rain and let nature take its course.

09 December 2007

The Floor





















If someone had told me that I would be installing a floor by myself any time up to the day I decided that I was going to do it, I would have laughed out loud. Be that as it may, after painting the interior, I sealed the cement floor with another 5 gallon bucket of oops! tinted cement sealer that I bought for another $15 (daily trips to Home Depot would occasionally pay off).

After considerable research and shopping around, I bought underlayment and pseudo pergo click and lock floor panels on clearance at Home Depot. I think the whole shebang cost me about $500.

I started in the far corner of the supply room:





















(see the pex tubing for the plumbing?) I cut the floor panels (rather roughly, I'm afraid) where I had to with a little jigsaw. Then I worked my way out through the main room





















and around to the back.






















I set myself 3 hour daily sessions so that I wouldn't burn myself out trying to do it all at once. I finished in 3 days. Yes, I consider this one of my greatest accomplishments! I just put my mind to it and I did it.

08 December 2007

Painting





















D.I.Y. now took on an entirely new depth of meaning. I painted the entire inside alone. I had a good time doing it, although the high ceilings were a challenge, and was very pleased with the results. To reach the highest parts of the main room ceiling I used ladders and extension poles and let myself not worry too much about covering every millimeter inside the high angle.

For the main room I used plain white ceiling paint because I found a 5 gallon bucket for $15 in the oops! paint section,. I think that the lid was damaged or something but the paint was just fine. For the loft I used other oops! paint I'd picked up along the way and hand mixed the pale yellow for the supply room and desert pink for the back room from left overs and colored quarts.

07 December 2007

Ditches


I was through with hiring contractors. I needed to solve the problem of water flowing towards the house and studio. So I figured out where the problem areas were, carefully read instructions on how to make drainage ditches, bought some perforated plastic drainage tubing and worked out a system: a French drain for the length of the front of the studio and buried plastic drains to perforated drains from the back of the house gutter pipes.

I called up the manager of the men's mission in town and had him find two good laborers for me. I picked up two men at the crack of dawn and we spent the day digging trenches together, laying drainage tubing and gravel and then covering it back up. I bought us all a big pizza lunch and after work snacks. They were two of the best workers I had throughout and you know they weren't expensive.


In the above photo, you can see a pile of of shoes and boots. I do not want to tell you how many pairs I went through over the course of the building! Dirt inside the shoes and boots. Dirty feet. Dirty floors.

06 December 2007

Humor




























Norman Cousins said that laughter is the best medicine and of course, he was right.

I have no idea how I managed to pull this book off the library shelf but I did and am glad of it. All about construction scams (and other things) after a south Florida hurricane, filled with dirty deeds and hoodwinked home owners (and other scenarios and characters). I got a good laugh reading this book at the perfect time. Thank you, Carl Hiaassen.

Apparently, I am compelled to tell you that I read it in regular type but the large print was all that was on the shelf yesterday for scanning.

05 December 2007

Dirt

Who knew that I would become one with dirt? For a while, I swear that I was channeling a dirt farmer from 1930's Oklahoma.

I raked up all the straw and hired someone else to come in and re-grade the yard. Water continued to accumulate and there were still little holes around the yard. I also discovered that the guys who originally "graded" the lawn had used rocky subsoil to replace my earthworm rich topsoil. When I called the original "grader" back to discuss the problems, he came back long enough to scream at me in my own back yard, telling me that I disgusted him. His exact words.

I walked back and forth up and down the yard pulling up emerging rocks. Admittedly it became my obsession. There was something fun about getting all muddy and dirty and something satisfying about doing back-breaking outdoor work in early summer heat. I ate huge farmer breakfasts after a few hours of dirt work in the morning. When I would finally quit in the evening, there was nothing left to do but put my feet up.

04 December 2007

First Grading





















Here's the scene after the first grading. You know there's something coming up if I'm talking about the "first" grading. But it looks all right from here. As soon as the guys finished grading, we spread clover seed, scattered hay and then it rained. Actually, we got a lot of rain. Then I noticed a few small lakes. You can see the depression from one below.





















This was not the only depression. There were at least three places that accumulated water during rain. I also could not help but notice that the water would run toward, not away from the house and the studio.

Oh, I wish I had a copy of Carl Hiaasen's Stormy Weather so that I could quote the paragraph about the truckload of "construction worker" cousins from Tennessee... I happened to be reading that just about this time and it was a life saver.

03 December 2007

Before Grading





















The yard was pretty ripped up from the trucks and the trenching. I'd remembered J. telling me that I'd have to have the yard graded after all the trucks were through. I did not know anything about grading. All the trucks were through. I was still under the mistaken impression that people who advertised themselves as professionals knew what they were doing. I was about to make my biggest mistake.





















Do you ever look back at an action you've taken and wondered why, when your better instincts were telling you something was wrong, you did not pay attention? I certainly have. My next door neighbor recommended a man to grade my yard and I should have looked further.

I also should have educated myself more about the process and brought in at least a second opinion but for some reason, I did not. I even had a chance to back out because before we had set a date for grading, I just happened to look out the kitchen window to see a crowd of guys with shovels and rakes coming up the back yard from the alley. I told them to come back after we'd made an appointment. That was my chance to back out but I didn't.

02 December 2007

Comfort



One day, I ran into a familiar face at the grocery store and racked my brain to remember through which contractor I knew the person. As it turned out, he ran a club where I'd performed. Yikes! I was a little too immersed in the project for my own good. He did, however, share the experience he and his wife (Jennifer O'Neill) had with contractors when they renovated their home the previous year. "Yeah", he said "They'll take your money, do a bad job and then make you out to be the guilty party for their shoddy work and rant at you if you expect the work to be done right." Or something to that effect.

Only then did it start to dawn on me that I was not alone in my experience. (Always a comforting moment.) Up till that point I was thinking that I must be asking the impossible or impossible to work for or hopeless at supervising workers on my own property.

I had always enjoyed reading Dominique Browning's editorial essays at the beginning of House and Garden issues and finally got around to reading her book Around the House and in the Garden. The timing could not have been better. The following paragraph stood out like a neon sign.

"I have a friend who, even years after its completion, could not talk about building her new house without crying, her experience with the contractor had been so devastating. I stood in my own newly renovated kitchen one day and watched rain drip from the ceiling. The roofer who finally showed up to fix what I thought was a leak pointed out that the doorsill in a room above the kitchen had been installed backward, so naturally rain was flowing into the house. It's been ten years since the renovation, and problems still crop up. Then there was the new furnace, which lasted a mere seven years of its lifetime guarantee (a concept, by the way, that is sheer fiction, lifetime being a self-defining characteristic—if it is broken, its lifetime has ended), installed incorrectly by a plumber who had the nerve to offer a discount on the installation of the next one. So I started all over again with another plumber. Each new contract I sign is an act of faith, and it is signed with a prayer that the work will be done, and done well, that ill will won't haunt the premises." Dominque Browning, Around the House and in the Garden (New York: Scribner, 2002 p.135)

After making my links for this post, I've discovered that the December 2007 issue of House and Garden will be the last. You can read Dominique Browning's final editorial here.

01 December 2007

Plumbing

I hired a guy named Mike Taylor to put in the plumbing line. This is a bit out of sequence as the trenches weren't filled before the plumbing line was laid but it all happened in quick succession between thunderstorms. The plumbing process was a comedy all its own although I was not always laughing. Mike showed up in an old beat up red truck, low to the ground with a hood tied down by sisal rope.

He used Pex tubing for the water line, had two very pleasant Mexicans who spoke no English do the manual labor and disappeared for hours at a time to go buy materials at Home Depot, seven minutes away.


At the bottom center of above photo is where the plumbing line comes into the studio. The spigot in top photo is mounted on the outside wall there. The boxed area hides the pipes that run through recessed interior wall to sink area in supply room.

No photos were taken during the plumbing as I discovered I had to supervise the work. Not that I had much of a clue about plumbing but the first french drain they dug out the back of the studio was a joke. I had never even seen a french drain and knew that it was done incorrectly. (Actually, previous to this incident, I'd had a long discussion with an architect about how to properly make one.) I insisted that they take it apart and re-do it. In fact, I was so pissed off that I helped with the digging. (A good way to work off steam.) Naturally, Mike Taylor was not pleased about this and got all "Yes, Ma'am" (more like, "Yes'm") about it but that was just too bad and I told him to knock it off.

One of the things that really got my hackles up was when I would hire contractors who, after explaining to them exactly what I wanted, assured me that they understood what I wanted and exactly how to do it and then turned out to have been lying or not listening or I have no idea what.

I later realized that Mike had been asking around at Home Depot about how to make a french drain. Fortunately, he knew how to make the required plumbing joints although he did not put in any shut-off valve between the house and the studio. To make matters worse, Mike wanted me to pay him in full for the job when there was still work to be done after the sink was installed. Although I did not pay him the full amount, I paid him more than I should have. And he whined about that like a two-year old.

It should come as no surprise that I never saw this man again and that the phone number I had for him was disconnected. Later, the highly thought-of plumber who originally had recommended this first man sent over a young plumber who's father had been a plumber. Not only did this second plumber finish the job properly and install a shut-off valve under the house at for a decent price but has been a big help ever since with little plumbing matters in the house, often talking me through issues by phone so that I don't have to pay his house call fee.

When I snapped the intro photo above this afternoon, I noticed that the spigot was not caulked. No time like the present!

30 November 2007

The Trench

Remember Willi? He'd promised me that he would dig the trenches for the electricity and plumbing out to the studio. Willi turned out to be the kind of guy who would say, "I'm on my way", at 7:30 in the morning and at 11:30 would say, after several phone calls assuring me that he was still on his way, "You know, it looks like it's going to rain. We'll have to make it another day." I cannot tell you how many mornings I spent waiting for him, always kicking myself that I'd fallen for his game again. I should have just walked around with a sign on my butt saying, "Kick Me." Anyway, he finally showed up in a brand-new back hoe with an enclosed cab, air conditioning and a CD player. He told me how much it cost but I can't remember now except that it was a lot.

So he dug the trench for the electric, the remnants of which is what you can see running to the front of the studio. Then he dug the trench for the plumbing which ran along the west side of the studio and around back.

I was too busy with whatever I was helping him with and doing on my own to take pictures or stand over him to watch what was happening but suddenly, with a few tasks still unfinished, I saw him pulling out the driveway. I walked over and asked him what was up. "Are you leaving?" He said, "It's 1:30. I've got to go." And he was gone with his new back hoe in a flash.

Later that evening, I was doing the dishes, looking out the window and thought, wait a minute... Do you remember Highlights for Children? My favorite part of that magazine was the puzzle in which you had to look at two similar picture drawings and figure out what from the first drawing was missing in the second. Take a look at the bottom edge of the roof line. Does something look funny? Yes, half of the gutter is missing.

Here's what happened. Willi was probably not used to his new piece of equipment and I'm not exactly sure how, but he took a chunk out of the front corner of the roof and completely tore apart the front end of the gutter. I could hardly believe my eyes when I saw it. Naturally, rain was on the way. So I went next door for Aubrey who helped me stuff and cover it with plastic. This I should really have taken a picture of but you'll have to use your imagination.

As it turns out, the damage was mostly to the fascia and soffit which were both pretty easily replaced along with one or two roof tiles. Needless to say, I never heard from Willi again. The coward.

29 November 2007

Mudding

The fellow who Terry Anderson sent over to mud the drywall seams was marvelous. I had such complete faith in his ability and integrity that I only popped in once or twice a day to say hello and see what what going on.

He set up his materials in the morning, turned on his radio and went to work. It took him about four days.

At the end, he helped me unload the flooring materials from my car just as a storm was about to hit. No complaints, no wise cracks.

28 November 2007

Wires and Drywall

I was definitely too busy making decisions during the wiring to take any pictures. I was not prepared with enough information in advance. Where to put the outlets? How many outlets? How about the switches? Where to position the track lights? Don't forget the outside motion sensor lights and the shed light. All you can see from that stage are the little blue plastic boxes. One's up there in the ceiling and another few in the photo below. I would have done a few things differently. Set the track lights away from the wall another six inches, put a main switch for the lights not only inside the front door but also at the back and at least wired for exterior lights on either side of the front door. But none of those issues are critical and I get along fine with the lighting and outlets as is.

See that piece of paper taped to the door? That's the back of the cartoon I posted yesterday.

Home Depot delivered the dry wall but did not put it in the building. Oh, yeah! I remember now. The drywall delivery was scheduled to coincide with the arrival of the drywall installers which happened to fall on the day of the National Immigrant Strike which means it was April 25, 2006. And, there was rain on the way. The drywall was delivered but the installers were Mexican. I forget how many sheets there were. 36? 48? More? I called one of the handymen and he and I together lifted the pieces and moved them inside which was oh, about ten feet or so. They do not call this stuff sheet rock for nothing. Of all the hard labor I did on this place, moving those pieces of drywall was the most difficult physical task. You have to do it to understand it. That's all I can say. Wow. But I did it (although I could not possibly have done it by myself) and lived to tell the tale.

Sheet rock work is DUSTY. It rained. The team of installers showed up the following evening and did a great job.

Terry Anderson was the drywall contractor I hired and he was the shining star of my show who kept me from losing complete faith in the ability and integrity of workers. He made sure that everything was done properly, in a timely manner, by able and friendly people at a fair price. He made me very happy.

Much later, I discovered that one of my little electrician friends drilled holes through the roof in two places when he was preparing the boxes for two of the motion sensor lights. Luckily, the roofer happened discovered both on two trips out for unrelated tasks.